Public Comment

Status For Public Comment of draft methodology and draft Project Design Document (PDD)

Open : Has been opened for public input/comment until the specified time
Closed : Public input/comment already finished and closed

No. Ref.No Description Type Public Comment Period Status
74 PDD_ID032 Introduction of CNG-Diesel Hybrid Equipment to Public Bus in Semarang Project Design Document 26 January 2023 - 24 February 2023 CLOSED
73 PDD_ID031 Installation of Aerator for Industrial Wastewater Treatment Facility in Rubber Factory Project Design Document 6 December 2022 - 4 January 2021 CLOSED
72 PDD_ID030 Installation of all-electric injection molding machine with power regeneration to plastics & packaging manufacturing plants Project Design Document 23 November 2022 - 22 December 2022 CLOSED
71 PDD_ID029 Energy Saving by Introducing High Efficiency Autoclave to Infusion Manufacturing Factory Project Design Document 24 December 2021 - 22 January 2022 CLOSED
70 ID_PM044 Installation of closed drain recovery system and utilization for boiler feed water Proposed Methodology 10 December 2021 - 24 December 2021 CLOSED
69 PDD_ID028 Introduction of Gas Co-generation System and Absorption Chiller to Motor Parts Factory Project Design Document 15 October 2021 - 13 November 2021 CLOSED
68 ID_PM043 Introducing double-bundle modular electric heat pumps to a new building  Revised Approved Methodology 17 March 2021 - 31 March 2021 CLOSED
67 ID_PM042 Installation of a separate type fridge-freezer showcase by using natural refrigerant for grocery store to reduce air conditioning load inside the store  Revised Approved Methodology 17 March 2021 - 31 March 2021 CLOSED
66 ID_PM041 Installation of LED Lighting for Grocery Store  Revised Approved Methodology 17 March 2021 - 31 March 2021 CLOSED
65 ID_PM040 Installation of Inverter-Type Air Conditioning System for Cooling for Grocery Store  Revised Approved Methodology 17 March 2021 - 31 March 2021 CLOSED
64 ID_PM039 Energy Saving by Introduction of High Efficiency Centrifugal Chiller  Revised Approved Methodology 17 March 2021 - 31 March 2021 CLOSED
63 PDD_ID027 10MW Mini Hydro Power Plant Project in North Sumatra Project Design Document 19 February 2021 - 20 March 2021 CLOSED
62 ID_PM038 Energy saving by introducing waste hot water recovery system to autoclave in infusion manufacturing process line Proposed Methodology 23 December 2020 - 6 January 2021 CLOSED
61 ID_PM037 Electricity generation by a biomass power plant Proposed Methodology 23 December 2020 - 6 January 2021 CLOSED
60 PDD_ID026 Introduction of LED Lighting to UNIQLO Sales Stores Project Design Document 3 December 2020 - 1 January 2021 CLOSED
59 PDD_ID025 Energy Saving for Industrial Park with Smart LED Street Lighting System Project Design Document 5 November 2020 - 4 December 2020 CLOSED
58 ID_PM036 Introduction of CNG-Diesel Hybrid Equipment to Public Buses Proposed Methodology 14 September 2020 - 28 September 2020 CLOSED
57 ID_PM035 Installation of all-electric injection molding machine with power regeneration Proposed Methodology 3 September 2020 - 17 September 2020 CLOSED
56 ID_PM034 Replacement of diffuser with aerator in aeration pond Proposed Methodology 12 May 2020 - 26 May 2020 CLOSED
55 ID_PM033 Installation of gas engine cogeneration system with absorption chiller to supply electricity, heating energy and cooling energy Proposed Methodology 12 May 2020 - 26 May 2020 CLOSED
54 PDD_ID024 Introduction of Absorption Chiller to Chemical Factory Project Design Document 15 Jan 2020 - 13 Feb 2020 CLOSED
53 PDD_ID023 Installation of Solar Power System and Storage Battery to Commercial Facility Project Design Document 15 Jan 2020 - 13 Feb 2020 CLOSED
52 ID_PM032 Introduction to Absorption Chiller Proposed Methodology

11 Oct 2019 - 25 Oct 2019

CLOSED
51 ID_PM031

Electricity generation by rehabilitaion of run-of-river hydro power generation system(s) in Indonesia

Proposed Methodology 20 Sep 2019 - 4 Oct 2019 CLOSED
50 ID_PM030 Introduction of energy efficient and high color rendering LED downlight/spotlight Proposed Methodology 29 Aug 2019 - 12 Sep 2019 CLOSED
49 PDD_ID010 Energy saving through introduction of Regenerative Burners for aluminum holding furnaces ofthe automotive components manufacture in the Republic of Indonesia Project Design Document 11 Apr 2019 - 10 May 2019 CLOSED
48 PDD_ID022 Introduction of High Efficiency Once-through Boiler in Golf Ball Factory Project Design Document 25 Mar 2019 - 23 Apr 2019 CLOSED
47 ID_PM028

Electricity generation by installation of run-of-river hydro power generation system(s) in Indonesia

Proposed Methodology 25 Mar 2019 - 08 Apr 2019 CLOSED
46 PDD_ID021 Introduction of High-efficiency Once-through Boiler in Film Factory Project Design Document

19 Feb 19  -  20 Mar 19

CLOSED
45 PDD_ID020

Introduction of High-Efficiency Looms in Weaving Mill 

Project Design Document

26 Dec 18  -  24 Jan 19

CLOSED
44 PDD_ID019 Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia Project Design Document

14 Dec 18 - 12 Jan 19

CLOSED
43 ID_PM027 Installation of LED Street Lighting with Lighting Control System Proposed Methodology 21 Nov - 5 Dec 18 CLOSED
42 PDD_ID018

1.6MW Solar PV Power Plant Project in Jakabaring Sport City

Project Design Document 1 Sep - 30 Sep 18 CLOSED
41 PDD_ID017

Introduction of 0.5MW Solar Power System to Aroma and Food Ingredients Factory

Project Design Document 1 Sep - 30 Sep 18 CLOSED
40 ID_PM025

Replacement of conventional burners with regenerative burners for aluminium holding furnaces

Revised Approved Methodology
  • 03 Jul 18   -  17 Jul 18
CLOSED
39 ID_PM024 Installation of Solar PV System and Storage Battery System Proposed Methodology 23 Jun-07 Jul 2018 CLOSED
38 ID_PM023 Installation of gas engine cogeneration system to supply electricity and heat to facility Proposed Methodology

03 Apr 2018 - 17 Apr 2018

CLOSED
37 ID_PM022 Energy Saving by Introduction of High Efficiency Once-through Boiler Proposed Methodology

03 Apr 2018 - 17 Apr 2018

CLOSED
36 PDD_ID016 Installation of Tribrid System to mobile communication’s Base Transceiver Stations in Republic of Indonesia Project Design Document

28 February - 29 March 2018

CLOSED
35 PDD_ID015 Reducing GHG emission at textile factories by upgrading to air-saving loom Project Design Document 6 February  - 7 March 2018 CLOSED
34 PDD_ID014 Energy saving by optimum operation at an oil refinery  Project Design Document 12 January - 10 February 2018 CLOSED
33 PDD_ID013 Power Generation by Waste Heat Recovery in the PT. Semen Indonesia (Persero) Tbk. Factory in Tuban Project Design Document 13th December 2017 - 11 January 2018 CLOSED
32 PDD_ID012 GHG emission reductions through utility facility operation optimization system for refineries in the Republic of Indonesia Project Design Document 20th October - 18th November 2017 CLOSED
31 ID_PM021 Installation of Tribrid Systems to mobile communication’s Base Transceiver Stations Proposed Methodology 20th October - 3rd November 2017  CLOSED
30 ID_PM020 Installation of Solar PV System Proposed Methodology 20th October - 3rd November 2017  CLOSED
29 PDD_ID011 Reduction of Energy Consumption by Introducing an Energy-Efficient Waste Paper Processing System into a Packaging Paper Factory in Bekasi, West Java Project Design Document 22nd July  - 20th August, 2017 CLOSED
28 ID_PM019 GHG emission reduction through optimization of Refinery Plant Operation in Indonesia Revised Approved Methodology 13th May - 27th May 2017 CLOSED
27 PDD_ID010 Energy saving through introduction of Regenerative Burners for aluminum holding furnaces of the automotive components manufacture in the Republic of Indonesia Project Design Document February 24th - March 25th, 2017 CLOSED
26 PDD_ID009 Energy Saving for Air-Conditioning at Shopping Mall with High Efficiency Centrifugal Chiller Project Design Document February 2nd - March 3rd, 2017 CLOSED
25 PDD_ID008 Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2 Project Design Document August 6th - September 4th, 2016 CLOSED
24 ID_PM018 Installation of Energy Saving Air Jet Loom at Textile Factory Proposed Methodology May 13th - May 27th, 2016 CLOSED
23 ID_PM017 Replacement of conventional burners with regenerative burners for aluminum holding furnaces Revised Approved Methodology April 14th - April 28th, 2016 CLOSED
22 ID_PM016 Reduction of Energy Consumption by Introducing an Energy-Efficient Old Corrugated Carton Processing System into a Cardboard Factory Proposed Methodology April 12th - April 26th, 2016 CLOSED
21 PDD_ID006 Installation of Inverter-type Air Conditioning System, LED Lighting and Separate Type Fridge-freezer Showcase to Grocery Stores in Republic of Indonesia Project Design Document December 1st - December 30th, 2015 CLOSED
20 PDD_ID005 Energy Saving for Air-conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Batang, Central Java (Phase 2) Project Design Document November 28th - December 27th, 2015 CLOSED
19 PDD_ID004 Energy Saving for Air-conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Karawang, West Java Project Design Document November 28th - December 27th, 2015 CLOSED
18 PDD_ID003 Project of Introduding High Efficiency Refrigerator to a Food Industry Cold Storage in Indonesia Project Design Document January 7th - February 5th, 2015 CLOSED
17 PDD_ID002 Project of Introdcucing High Efficiency Refrigerator to a Food Industry Cold Storage in Indonesia Project Design Document January 7, - February 5th, 2015 CLOSED
16 PDD_ID001 Energy Saving for Air-conditioning and Process Cooling by Introducing High-efficiency Centrifugal Chiller Project Design Document September 25th - October 24th, 2014 CLOSED
15 ID_PM015 Installation of a Separate Type Fridge-freezer Showcase by using Natural Refrigerant for Grocery Store to Reduce Air Conditioning Load Inside the Store Revised Approved Methodology October 9th - October 23rd, 2015 CLOSED
14 ID_PM014 Installation of LED Lighting for Grocery Store Revised Approved Methodology October 9th - October 23rd, 2015 CLOSED
13 ID_PM013 Installation of Inverter-type Air Conditioning System for Cooling for Grocery Store Revised Approved Methodology October 9th - October 23rd, 2015 CLOSED
12 ID_PM012 Installation of Energy-efficient Refrigerators using Natural Refrigerant at Food Industry Cold Storage and Frozen Food Processing Plant Revised Approved Methodology October 9th - October 23rd, 2015 CLOSED
11 ID_PM011 Energy Saving by Introduction of High-efficiency Centrifugal Chiller Revised Approved Methodology October 9th - October 23rd, 2015 CLOSED
10 ID_PM010 Introducing Double -bundle Modular Electric Heat Pumps to a New Building Methodology May 1st - May 15th, 2015 CLOSED
9 ID_PM009 Replacement of Conventional Burners with Regenerative Burners for Aluminum Holding Furnaces Methodology May 1st - May 15th, 2015 CLOSED
8 ID_PM008 Installation of a Separate Type Fridge-freezer Showcase by using Natural Refrigerant for Grocery Store to Reduce Air Conditioning Load Inside The Store Methodology May 1st - May 15th, 2015 CLOSED
7 ID_PM007 GHG emission reductions through optimization of Boiler Operation in Indonesia Methodology October 16th - October 30th, 2014 CLOSED
6 ID_PM006 GHG emission reduction through optimization of Refinery Plant Operation in Indonesia Methodology October 16th - October 30th, 2014 CLOSED
5 ID_PM005 Installation of Inverter-type Air Conditioning System for Cooling for Grocery Store Proposed Methodology September 10th - September 24th, 2014 CLOSED
4 ID_PM004 Installation of LED Lighting for Grocery Store Proposed Methodology September 10th - September 24th, 2014 CLOSED
3 ID_PM003 Installation of Energy-efficient Refrigerators using Natural Refrigerant at Food Industry Cold Storage and Frozen Food Processing Plant Proposed Methodology September 10th - September 24th, 2014 CLOSED
2 ID_PM002 Energy Saving by High-efficiency Centrifugal Chiller Proposed Methodology May 1st - May 15th, 2014 CLOSED
1 ID_PM001 Power Generation by Waste Heat Recovery in Cement Industry  Proposed Methodology May 1st - May 15th, 2014 CLOSED