Public Comment
Status For Public Comment of draft methodology and draft Project Design Document (PDD)
Open : Has been opened for public input/comment until the specified time
Closed : Public input/comment already finished and closed
No. | Ref.No | Description | Type | Public Comment Period | Status |
---|---|---|---|---|---|
74 | PDD_ID032 | Introduction of CNG-Diesel Hybrid Equipment to Public Bus in Semarang | Project Design Document | 26 January 2023 - 24 February 2023 | CLOSED |
73 | PDD_ID031 | Installation of Aerator for Industrial Wastewater Treatment Facility in Rubber Factory | Project Design Document | 6 December 2022 - 4 January 2021 | CLOSED |
72 | PDD_ID030 | Installation of all-electric injection molding machine with power regeneration to plastics & packaging manufacturing plants | Project Design Document | 23 November 2022 - 22 December 2022 | CLOSED |
71 | PDD_ID029 | Energy Saving by Introducing High Efficiency Autoclave to Infusion Manufacturing Factory | Project Design Document | 24 December 2021 - 22 January 2022 | CLOSED |
70 | ID_PM044 | Installation of closed drain recovery system and utilization for boiler feed water | Proposed Methodology | 10 December 2021 - 24 December 2021 | CLOSED |
69 | PDD_ID028 | Introduction of Gas Co-generation System and Absorption Chiller to Motor Parts Factory | Project Design Document | 15 October 2021 - 13 November 2021 | CLOSED |
68 | ID_PM043 | Introducing double-bundle modular electric heat pumps to a new building | Revised Approved Methodology | 17 March 2021 - 31 March 2021 | CLOSED |
67 | ID_PM042 | Installation of a separate type fridge-freezer showcase by using natural refrigerant for grocery store to reduce air conditioning load inside the store | Revised Approved Methodology | 17 March 2021 - 31 March 2021 | CLOSED |
66 | ID_PM041 | Installation of LED Lighting for Grocery Store | Revised Approved Methodology | 17 March 2021 - 31 March 2021 | CLOSED |
65 | ID_PM040 | Installation of Inverter-Type Air Conditioning System for Cooling for Grocery Store | Revised Approved Methodology | 17 March 2021 - 31 March 2021 | CLOSED |
64 | ID_PM039 | Energy Saving by Introduction of High Efficiency Centrifugal Chiller | Revised Approved Methodology | 17 March 2021 - 31 March 2021 | CLOSED |
63 | PDD_ID027 | 10MW Mini Hydro Power Plant Project in North Sumatra | Project Design Document | 19 February 2021 - 20 March 2021 | CLOSED |
62 | ID_PM038 | Energy saving by introducing waste hot water recovery system to autoclave in infusion manufacturing process line | Proposed Methodology | 23 December 2020 - 6 January 2021 | CLOSED |
61 | ID_PM037 | Electricity generation by a biomass power plant | Proposed Methodology | 23 December 2020 - 6 January 2021 | CLOSED |
60 | PDD_ID026 | Introduction of LED Lighting to UNIQLO Sales Stores | Project Design Document | 3 December 2020 - 1 January 2021 | CLOSED |
59 | PDD_ID025 | Energy Saving for Industrial Park with Smart LED Street Lighting System | Project Design Document | 5 November 2020 - 4 December 2020 | CLOSED |
58 | ID_PM036 | Introduction of CNG-Diesel Hybrid Equipment to Public Buses | Proposed Methodology | 14 September 2020 - 28 September 2020 | CLOSED |
57 | ID_PM035 | Installation of all-electric injection molding machine with power regeneration | Proposed Methodology | 3 September 2020 - 17 September 2020 | CLOSED |
56 | ID_PM034 | Replacement of diffuser with aerator in aeration pond | Proposed Methodology | 12 May 2020 - 26 May 2020 | CLOSED |
55 | ID_PM033 | Installation of gas engine cogeneration system with absorption chiller to supply electricity, heating energy and cooling energy | Proposed Methodology | 12 May 2020 - 26 May 2020 | CLOSED |
54 | PDD_ID024 | Introduction of Absorption Chiller to Chemical Factory | Project Design Document | 15 Jan 2020 - 13 Feb 2020 | CLOSED |
53 | PDD_ID023 | Installation of Solar Power System and Storage Battery to Commercial Facility | Project Design Document | 15 Jan 2020 - 13 Feb 2020 | CLOSED |
52 | ID_PM032 | Introduction to Absorption Chiller | Proposed Methodology |
11 Oct 2019 - 25 Oct 2019 |
CLOSED |
51 | ID_PM031 |
Electricity generation by rehabilitaion of run-of-river hydro power generation system(s) in Indonesia |
Proposed Methodology | 20 Sep 2019 - 4 Oct 2019 | CLOSED |
50 | ID_PM030 | Introduction of energy efficient and high color rendering LED downlight/spotlight | Proposed Methodology | 29 Aug 2019 - 12 Sep 2019 | CLOSED |
49 | PDD_ID010 | Energy saving through introduction of Regenerative Burners for aluminum holding furnaces ofthe automotive components manufacture in the Republic of Indonesia | Project Design Document | 11 Apr 2019 - 10 May 2019 | CLOSED |
48 | PDD_ID022 | Introduction of High Efficiency Once-through Boiler in Golf Ball Factory | Project Design Document | 25 Mar 2019 - 23 Apr 2019 | CLOSED |
47 | ID_PM028 |
Electricity generation by installation of run-of-river hydro power generation system(s) in Indonesia |
Proposed Methodology | 25 Mar 2019 - 08 Apr 2019 | CLOSED |
46 | PDD_ID021 | Introduction of High-efficiency Once-through Boiler in Film Factory | Project Design Document |
19 Feb 19 - 20 Mar 19 |
CLOSED |
45 | PDD_ID020 |
Introduction of High-Efficiency Looms in Weaving Mill |
Project Design Document |
26 Dec 18 - 24 Jan 19 |
CLOSED |
44 | PDD_ID019 | Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia | Project Design Document |
14 Dec 18 - 12 Jan 19 |
CLOSED |
43 | ID_PM027 | Installation of LED Street Lighting with Lighting Control System | Proposed Methodology | 21 Nov - 5 Dec 18 | CLOSED |
42 | PDD_ID018 |
1.6MW Solar PV Power Plant Project in Jakabaring Sport City |
Project Design Document | 1 Sep - 30 Sep 18 | CLOSED |
41 | PDD_ID017 |
Introduction of 0.5MW Solar Power System to Aroma and Food Ingredients Factory |
Project Design Document | 1 Sep - 30 Sep 18 | CLOSED |
40 | ID_PM025 |
Replacement of conventional burners with regenerative burners for aluminium holding furnaces |
Revised Approved Methodology |
|
CLOSED |
39 | ID_PM024 | Installation of Solar PV System and Storage Battery System | Proposed Methodology | 23 Jun-07 Jul 2018 | CLOSED |
38 | ID_PM023 | Installation of gas engine cogeneration system to supply electricity and heat to facility | Proposed Methodology |
03 Apr 2018 - 17 Apr 2018 |
CLOSED |
37 | ID_PM022 | Energy Saving by Introduction of High Efficiency Once-through Boiler | Proposed Methodology |
03 Apr 2018 - 17 Apr 2018 |
CLOSED |
36 | PDD_ID016 | Installation of Tribrid System to mobile communication’s Base Transceiver Stations in Republic of Indonesia | Project Design Document |
28 February - 29 March 2018 |
CLOSED |
35 | PDD_ID015 | Reducing GHG emission at textile factories by upgrading to air-saving loom | Project Design Document | 6 February - 7 March 2018 | CLOSED |
34 | PDD_ID014 | Energy saving by optimum operation at an oil refinery | Project Design Document | 12 January - 10 February 2018 | CLOSED |
33 | PDD_ID013 | Power Generation by Waste Heat Recovery in the PT. Semen Indonesia (Persero) Tbk. Factory in Tuban | Project Design Document | 13th December 2017 - 11 January 2018 | CLOSED |
32 | PDD_ID012 | GHG emission reductions through utility facility operation optimization system for refineries in the Republic of Indonesia | Project Design Document | 20th October - 18th November 2017 | CLOSED |
31 | ID_PM021 | Installation of Tribrid Systems to mobile communication’s Base Transceiver Stations | Proposed Methodology | 20th October - 3rd November 2017 | CLOSED |
30 | ID_PM020 | Installation of Solar PV System | Proposed Methodology | 20th October - 3rd November 2017 | CLOSED |
29 | PDD_ID011 | Reduction of Energy Consumption by Introducing an Energy-Efficient Waste Paper Processing System into a Packaging Paper Factory in Bekasi, West Java | Project Design Document | 22nd July - 20th August, 2017 | CLOSED |
28 | ID_PM019 | GHG emission reduction through optimization of Refinery Plant Operation in Indonesia | Revised Approved Methodology | 13th May - 27th May 2017 | CLOSED |
27 | PDD_ID010 | Energy saving through introduction of Regenerative Burners for aluminum holding furnaces of the automotive components manufacture in the Republic of Indonesia | Project Design Document | February 24th - March 25th, 2017 | CLOSED |
26 | PDD_ID009 | Energy Saving for Air-Conditioning at Shopping Mall with High Efficiency Centrifugal Chiller | Project Design Document | February 2nd - March 3rd, 2017 | CLOSED |
25 | PDD_ID008 | Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2 | Project Design Document | August 6th - September 4th, 2016 | CLOSED |
24 | ID_PM018 | Installation of Energy Saving Air Jet Loom at Textile Factory | Proposed Methodology | May 13th - May 27th, 2016 | CLOSED |
23 | ID_PM017 | Replacement of conventional burners with regenerative burners for aluminum holding furnaces | Revised Approved Methodology | April 14th - April 28th, 2016 | CLOSED |
22 | ID_PM016 | Reduction of Energy Consumption by Introducing an Energy-Efficient Old Corrugated Carton Processing System into a Cardboard Factory | Proposed Methodology | April 12th - April 26th, 2016 | CLOSED |
21 | PDD_ID006 | Installation of Inverter-type Air Conditioning System, LED Lighting and Separate Type Fridge-freezer Showcase to Grocery Stores in Republic of Indonesia | Project Design Document | December 1st - December 30th, 2015 | CLOSED |
20 | PDD_ID005 | Energy Saving for Air-conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Batang, Central Java (Phase 2) | Project Design Document | November 28th - December 27th, 2015 | CLOSED |
19 | PDD_ID004 | Energy Saving for Air-conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Karawang, West Java | Project Design Document | November 28th - December 27th, 2015 | CLOSED |
18 | PDD_ID003 | Project of Introduding High Efficiency Refrigerator to a Food Industry Cold Storage in Indonesia | Project Design Document | January 7th - February 5th, 2015 | CLOSED |
17 | PDD_ID002 | Project of Introdcucing High Efficiency Refrigerator to a Food Industry Cold Storage in Indonesia | Project Design Document | January 7, - February 5th, 2015 | CLOSED |
16 | PDD_ID001 | Energy Saving for Air-conditioning and Process Cooling by Introducing High-efficiency Centrifugal Chiller | Project Design Document | September 25th - October 24th, 2014 | CLOSED |
15 | ID_PM015 | Installation of a Separate Type Fridge-freezer Showcase by using Natural Refrigerant for Grocery Store to Reduce Air Conditioning Load Inside the Store | Revised Approved Methodology | October 9th - October 23rd, 2015 | CLOSED |
14 | ID_PM014 | Installation of LED Lighting for Grocery Store | Revised Approved Methodology | October 9th - October 23rd, 2015 | CLOSED |
13 | ID_PM013 | Installation of Inverter-type Air Conditioning System for Cooling for Grocery Store | Revised Approved Methodology | October 9th - October 23rd, 2015 | CLOSED |
12 | ID_PM012 | Installation of Energy-efficient Refrigerators using Natural Refrigerant at Food Industry Cold Storage and Frozen Food Processing Plant | Revised Approved Methodology | October 9th - October 23rd, 2015 | CLOSED |
11 | ID_PM011 | Energy Saving by Introduction of High-efficiency Centrifugal Chiller | Revised Approved Methodology | October 9th - October 23rd, 2015 | CLOSED |
10 | ID_PM010 | Introducing Double -bundle Modular Electric Heat Pumps to a New Building | Methodology | May 1st - May 15th, 2015 | CLOSED |
9 | ID_PM009 | Replacement of Conventional Burners with Regenerative Burners for Aluminum Holding Furnaces | Methodology | May 1st - May 15th, 2015 | CLOSED |
8 | ID_PM008 | Installation of a Separate Type Fridge-freezer Showcase by using Natural Refrigerant for Grocery Store to Reduce Air Conditioning Load Inside The Store | Methodology | May 1st - May 15th, 2015 | CLOSED |
7 | ID_PM007 | GHG emission reductions through optimization of Boiler Operation in Indonesia | Methodology | October 16th - October 30th, 2014 | CLOSED |
6 | ID_PM006 | GHG emission reduction through optimization of Refinery Plant Operation in Indonesia | Methodology | October 16th - October 30th, 2014 | CLOSED |
5 | ID_PM005 | Installation of Inverter-type Air Conditioning System for Cooling for Grocery Store | Proposed Methodology | September 10th - September 24th, 2014 | CLOSED |
4 | ID_PM004 | Installation of LED Lighting for Grocery Store | Proposed Methodology | September 10th - September 24th, 2014 | CLOSED |
3 | ID_PM003 | Installation of Energy-efficient Refrigerators using Natural Refrigerant at Food Industry Cold Storage and Frozen Food Processing Plant | Proposed Methodology | September 10th - September 24th, 2014 | CLOSED |
2 | ID_PM002 | Energy Saving by High-efficiency Centrifugal Chiller | Proposed Methodology | May 1st - May 15th, 2014 | CLOSED |
1 | ID_PM001 | Power Generation by Waste Heat Recovery in Cement Industry | Proposed Methodology | May 1st - May 15th, 2014 | CLOSED |