[CLOSED] PUBLIC COMMENT ON PROPOSED PROJECT PDD ID030 "Installation of all-electric injection molding machine with power regeneration to plastics & packaging manufacturing plants"
The draft PDD was submitted to the JCM secretariat between Indonesia and Japan on 18 November 2022.
The JCM secretariat of Indonesian and Japanese side makes the draft PDD publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.
Information on the proposed project below is available for download.
All stakeholders are invited to provide their comments on the proposed project to the following both two email addresses id-pdd-pi@jcm.go.jp; secretariat@jcmindonesia.com only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:
NOTE: The secretariat makes all received comments publicly available unless the TPE determines that the comment is unauthentic in line with paragraph 42 of the Joint Crediting Mechanism Project Cycle Procedure.
This call for public comments is open from 23 November 2022 to 22 December 2022 (24:00 GMT).
Project title |
Installation of all-electric injection molding machine with power regeneration to plastics & packaging manufacturing plants |
|
---|---|---|
Name of project participants (Indonesia) | PT Dynaplast; Project location 1. Dynaplast; Project location 2. Sanpak Unggul; Project location 3. Dynaplast Jatake; Project location 4. Rapidplast Plant2; Project location 5. Rapidplast Plant4; Project location 6. Dynaplast Plant8; Project location 7. Dynaplast 4 | |
Name of project participants (Japan) | Tokyo Century Corporation | |
Name of third party entity (TPE) | TPE-ID-003 Japan Quality Assurance Organization | |
Location of project |
Country: The Republic of Indonesia |
|
Duration | Starting date of project operation: 28 Mar 20 Expected operational lifetime of project: 8 years |
|
Methodology No. |
|
|
Emission Reductions |
Estimated emission reductions in each year |
|
Status | PDD and MOC submitted |