ID023 Installation of Solar Power System and Storage Battery to Commercial Facility

Project Title Installation of Solar Power System and Storage Battery to Commercial Facility
Ref No. ID023
Document PDD Form
Monitoring Plan
MoC (PDF) Download PDF
Project Participants (Indonesia) PT. AEON Mall Indonesia
Project Participants (Japan) Itochu Corporation
Location of Project
 
Country: Republic of Indonesia
Region/State/Province etc:  Jakarta Capital Special Region
City/Town/Community etc: Jakarta
 
Latitude, Longitude: 6°10'19.6"S 106°57'06.9"E
Third Party Entities TPE-ID-013 PT TUV Rheinland Indonesia
Duration Starting date of project operation: 30 Sep 2017
Expected operational lifetime of project: 4 years
Methodology No. ID_AM017 Ver1.0
Emission Reductions (tCO2e)

Estimated emission reductions in each year (tCO2) : 

  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • - (in 2016)
  • 95 (in 2017)
  • 395 (in 2018)
  • 395 (in 2019)
  • 395 (in 2020)
  • 98 (in 2021)
  • - (in 2022)
  • - (in 2023)
  • - (in 2024)
  • - (in 2025)
  • - (in 2026)
  • - (in 2027)
  • - (in 2028)
  • - (in 2029)
  • - (in 2030)
Status Project Registered
Public comment 15 January 2020  -  13 February 2020
Registration Registration Form
Validation Report (PDF)
Completeness Check Complete on 09 January 2021
Registration Date 17 February 2021