[CLOSED] Public Comment on proposed project PDD ID027 "10MW Mini Hydro Power Plant Project in North Sumatra"
The draft PDD was submitted to the JCM secretariat between Indonesia and Japan on 16 February 2021.
The JCM secretariat of Indonesian and Japanese side makes the draft PDD publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.
Information on the proposed project below is available for download.
All stakeholders are invited to provide their comments on the proposed project to the following both two email addresses id-pdd-pi@jcm.go.jp; secretariat@jcmindonesia.com only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:
NOTE: The secretariat makes all received comments publicly available unless the TPE determines that the comment is unauthentic in line with paragraph 42 of the Joint Crediting Mechanism Project Cycle Procedure.
This call for public comments is open from 19 February to 20 March 2021 (24:00 GMT).
Project title |
10MW Mini Hydro Power Plant Project in North Sumatra |
|
---|---|---|
Name of project participants (Indonesia) | PT. Citra Multi Energi | |
Name of project participants (Japan) | TOYO ENERGY FARM CO., LTD. | |
Name of third party entity (TPE) | TPE-ID-003 Japan Quality Assurance Organization | |
Location of project |
Country: Republic of Indonesia Latitude, Longitude: N2°20’54” and E98°27’13” (Weir); N2°20’28” and E98°26’12” (Power Plant) |
|
Duration | Starting date of project operation: 27 Aug 20 Expected operational lifetime of project: 22 years |
|
Methodology No. |
|
|
Emission Reductions |
Estimated emission reductions in each year (tCO2) :
|
|
Status | PDD and MOC submitted |