[CLOSED] - Public Comment on Proposed Project PDD ID025 "Energy Saving for Industrial Park with Smart LED Street Lighting System"
The draft PDD was submitted to the JCM secretariat between Indonesia and Japan on 21 October 2020.
The JCM secretariat of Indonesian and Japanese side makes the draft PDD publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.
Information on the proposed project below is available for download.
All stakeholders are invited to provide their comments on the proposed project to the following both two email addresses id-pdd-pi@jcm.go.jp; secretariat@jcmindonesia.com only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:
NOTE: The secretariat makes all received comments publicly available unless the TPE determines that the comment is unauthentic in line with paragraph 42 of the Joint Crediting Mechanism Project Cycle Procedure.
This call for public comments is open from 5 November to 4 December 2020 (24:00 GMT).
Project title |
Energy Saving for Industrial Park with Smart LED Street Lighting System |
---|---|
Name of project participants (Indonesia) | PT. MALIGI PERMATA INDUSTRIAL ESTATE; PT. HARAPAN ANANG BAKRI & SONS; PT. KARAWANG TATABINA INDUSTRIAL ESTATE |
Name of project participants (Japan) | NTT FACILITIES, INC. |
Name of third party entity (TPE) | TPE-ID-003 Japan Quality Assurance Organization |
Location of project |
Country: The Republic of Indonesia
Region/State/Province etc: Jawa Barat City/Town/Community etc: Karawang Latitude, longitude: S 6°21'34.6" and E 107°16'27.4" |
Duration | Starting date of project operation: 30 Sep 16 Expected operational lifetime of project: 10 years |
Methodology No. | |
Emission Reductions |
Estimated emission reductions in each year (tCO2) :
|
Status | PDD and MOC submitted |