[CLOSED] Public Comment on proposed project PDD ID008 "Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2"
The draft PDD was submitted to the JCM secretariat between Indonesia and Japan on 4th August 2016.
The JCM secretariat of Indonesian and Japanese side makes the draft PDD publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.
Information on the proposed project below is available for download.
All stakeholders are invited to provide their comments on the proposed project to the following both two email addresses id-pdd-pi@jcm.go.jp and secretariat@jcmindonesia.com only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:
NOTE: The secretariat makes all received comments publicly available unless the TPE determines that a comment is unauthentic in line with paragraph 39 of the Joint Crediting Mechanism Project Cycle Procedure.
This call for public comments is open from: August 6th, 2016 to September 4th, 2016 (24:00 GMT).
Project title |
Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2 |
---|---|
Name of project participants (Indonesia) | PT. TTL Residences |
Name of project participants (Japan) | Toyota Tsusho Corporation |
Name of third party entity (TPE) | TPE-ID-003 Japan Quality Assurance Organization |
Location of project |
Country: Republic of Indonesia Latitude, longitude: S06°19'40.5660", E107°08'02.3028" |
Duration | Starting date of project operation:01 April 2016 Expected operational lifetime of project: 8 years |
Methodology No. | |
Emission Reductions |
Estimated emission reductions in each year :
|
Status | PDD and Moc submitted |