[CLOSED] Public Comment on proposed project PDD ID006 "Installation of Inverter-type Air Conditioning System, LED Lighting and Separate Type Fridge Freezer Showcase to Grocery Stores in Republic of Indonesia"
The draft PDD was submitted to the JCM secretariat between Indonesia and Japan on 30 November 2015.
The JCM secretariat of Indonesian and Japanese side makes the draft PDD publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.
Information on the proposed project below is available for download.
All stakeholders are invited to provide their comments on the proposed project to the following both two email addresses id-pdd-pi@jcm.go.jp and secretariat@jcmindonesia.com only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:
NOTE: The secretariat makes all received comments publicly available unless the TPE determines that a comment is unauthentic in line with paragraph 39 of the Joint Crediting Mechanism Project Cycle Procedure.
This call for public comments is open from: December 1, 2015 to December 30, 2015 (24:00 GMT).
Project title |
Installation of Inverter-type Air Conditioning System, LED Lighting and Separate Type Fridge Freezer Showcase to Grocery Stores in Republic of Indonesia |
---|---|
Name of project participants (Indonesia) | PT MIDI UTAMA INDONESIA Tbk |
Name of project participants (Japan) | Lawson, Inc |
Name of third party entity (TPE) | TPE-ID-003 Japan Quality Assurance Organization |
Location of project |
Country: Republic of Indonesia Latitude, longitude: [Store 1]: S6.196687, E106.724439, [Store 2]: S6.31824, E106.82492, [Store 3]: S6.140649, E106.632588, [Store 4]: S6.38269, E106.76871, [Store 5]: S6.233291, E106.856846, [Store 6]: S6.20418, E106.79345, [Store 7] : S6.20104, E106.85588, [Store 8]: S6.299088, E106.859263, [Store 9]: S6.115741, 106.907058, [Store 10]: S6.262454, 106.731617, [Store 11]: S6.396444, E106.804556, [Store 12]: S6.296151, E107.020927 |
Duration | Starting date of project operation: 21 Feb 2014 Expected operational lifetime of project: 8 years |
Methodology No. | |
Emission Reductions |
Estimated emission reductions in each year :
|
Status | PDD and Moc submitted |