[CLOSED] Public Comment on proposed project PDD ID004 "Energy Saving for Air-Conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Karawang, West Java"

The draft PDD was submitted to the JCM secretariat between Indonesia and Japan on 27 November 2015.
The JCM secretariat of Indonesian and Japanese side makes the draft PDD publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.

Information on the proposed project below is available for download.

All stakeholders are invited to provide their comments on the proposed project to the following both two email addresses id-pdd-pi@jcm.go.jp and secretariat@jcmindonesia.com only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:

NOTE: The secretariat makes all received comments publicly available unless the TPE determines that a comment is unauthentic in line with paragraph 39 of the Joint Crediting Mechanism Project Cycle Procedure.

This call for public comments is open from: November 28, 2015 to December 27, 2015 (24:00 GMT).

 

Project title

Energy Saving for Air-Conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Karawang, West Java
Ref No. ID004
PDD 

Monitoring Plan

Supporting Document 1

Supporting Document 2

Name of project participants (Indonesia) PT. Nikawa Textile Industry
Name of project participants (Japan) Nippon Koei Co., Ltd. (Focal Point), Ebara Refrigeration Equipment & Systems Co., Ltd.
Name of third party entity (TPE) TPE-ID-011 PT. Mutu Agung Lestari
Location of project Country: Republic of Indonesia
Region/State/Province etc: West Java Province
City/Town/Community etc: Karawang Regency
Latitude, longitude:

6°36'74.04 S, 107°32'08.75 E

Duration Starting date of project operation: 20 Dec 2015
Expected operational lifetime of project: 7 years
Methodology No.
Emission Reductions

Estimated emission reductions in each year

  • - (in 2013)
  • 6 (in 2014)
  • 187 (in 2015)
  • 187 (in 2016)
  • 187 (in 2017)
  • 187 (in 2018)
  • 187 (in 2019)
  • 187 (in 2020)
Status PDD and Moc submitted

 

BACK