[CLOSED] PUBLIC COMMENT ON PROPOSED PROJECT PDD ID029 "Energy Saving by Introducing High Efficiency Autoclave to Infusion Manufacturing Factory"

The draft PDD was submitted to the JCM secretariat between Indonesia and Japan on 21 December 2021.
The JCM secretariat of Indonesian and Japanese side makes the draft PDD publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.

Information on the proposed project below is available for download.

All stakeholders are invited to provide their comments on the proposed project to the following both two email addresses id-pdd-pi@jcm.go.jp; secretariat@jcmindonesia.com only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:

NOTE: The secretariat makes all received comments publicly available unless the TPE determines that the comment is unauthentic in line with paragraph 42 of the Joint Crediting Mechanism Project Cycle Procedure.

This call for public comments is open from 24 December 2021 to 22 January 2022 (24:00 GMT).

Project title

Energy Saving by Introducing High Efficiency Autoclave to Infusion Manufacturing Factory 
Ref No. ID029
PDD 
Monitoring Plan

Name of project participants (Indonesia) PT. Otsuka Indonesia
Name of project participants (Japan) Otsuka Pharmaceutical Factory, Inc.
Name of third party entity (TPE) TPE-ID-011 PT. Mutuagung Lestari 
Location of project

Country: Republic of Indonesia
Region/State/Province etc: East Java
City/Town/Community etc: Malang

Latitude, Longitude: 7°84'48.3"S 112°70'29.8"E

Duration Starting date of project operation: 13 Mar 19
Expected operational lifetime of project: 8 years
Methodology No.

ID_AM028 Ver1.0

Emission Reductions

Estimated emission reductions in each year (tCO2) : 

  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • - (in 2016)
  • - (in 2017)
  • - (in 2018)
  • 167 (in 2019)
  • 207 (in 2020)
  • 207 (in 2021)
  • 207 (in 2022)
  • 207 (in 2023)
  • 207 (in 2024)
  • 207 (in 2025)
  • 207 (in 2026)
  • 207 (in 2027)
  • - (in 2028)
  • - (in 2029)
  • - (in 2030)
Status PDD and MOC submitted

 

BACK