[CLOSED] - Public Comment on Proposed Methodology ID_PM033 "Installation of gas engine cogeneration system with absorption chiller to supply electricity, heating energy and cooling energy"

Below is the proposed methodology which has been submitted to Joint Committee Indonesia and Japan on 12 March 2020. Secretariat has done the completeness check towards the proposed methodology and has been considered as complete. Secretariat has publicized the proposed methodology which is open for public comment in accordance with the provision on para 1.4.3 in The Joint Crediting Mechanism Project Cycle Procedure [pdf]

Proposed Methodology : ID_PM033

Proposed Methodology Title :

Installation of gas engine cogeneration system with absorption chiller to supply electricity, heating energy and cooling energy

Methodology Proponent : DENSO Corporation
Proposed Methodology Document & Additional Information :

Proposed Methodology [PDF]

Proposed Methodology Sheet [Excel]

Additional Information [PDF]

All Stakeholders are invited to provide their comments on the proposed methodology to the following both two e-mail addresses : id-pm-pi@jcm.go.jp dan secretariat@jcmindonesia.com only in English, including the following information :

  • Name :
  • Affiliated Organization :
  • E-mail Address :
  • Country :
  • Part of the document (Cover sheet/A/B/C/etc):
  • Page the document:
  • Comment on the page (including justification of the change):
  • Proposed change (including proposed text):

*Notes : The Secretariat makes all received comments publicly available.  

**This call for public comment period is open from 12 to 26 May 2020 (24:00 GMT)

 

 

Submission Date Submission
   

 

BACK