ID021 Introduction of High-efficiency Once-through Boiler in Film Factory

 

Project Title Introduction of High-efficiency Once-through Boiler in Film Factory
Ref No. ID021
Document

PDD 

Monitoring Plan

MoC (PDF) MoC
Project Participants (Indonesia) PT MC Pet Film Indonesia
Project Participants (Japan) Mitsubishi Chemical Corporation; Nippon Koei Co., Ltd.
Third Party Entities TPE-ID-002 Lloyd's Register Quality Assurance Limited
Location of Project

Country: Republic of Indonesia
Region/State/Province etc: Banten
City/Town/Community etc: Cilegon
Latitude, longitude:

S 5°58'04", E 106°00'09"

Duration Starting date of project operation: 01 Nov 16
Expected operational lifetime of project: 9 years
Methodology No.

ID_AM015 Ver1.0

Emission Reductions (tCO2e)

Estimated emission reductions in each year

  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • 225 (in 2016)
  • 994 (in 2017)
  • 523 (in 2018)
  • 523 (in 2019)
  • 1,047 (in 2020)
  • 994 (in 2021)
  • 994 (in 2022)
  • 1,047 (in 2023)
  • 994 (in 2024)
  • 828 (in 2025)
  • - (in 2026)
  • - (in 2027)
  • - (in 2028)
  • - (in 2029)
  • - (in 2030)
status Project Registered
Public comment

19 Feb 19  -  20 Mar 19

Registration Registration Form
Validation Report (PDF)
Completeness Check Complete on 9 Oct 19
Registration Date 31 Oct 19