[CLOSED] - Public Comment on Proposed Methodology ID_PM031 "Electricity generation by rehabilitation of run-of-river hydro power generation system(s) in Indonesia"

Below is the proposed methodology which has been submitted to Joint Committee Indonesia and Japan on 17 September 2019. Secretariat has done the completeness check towards the proposed methodology and has been considered as complete. Secretariat has publicized the proposed methodology which is open for public comment in accordance with the provision on para 1.4.3 in The Joint Crediting Mechanism Project Cycle Procedure [pdf]

Proposed Methodology : ID_PM031

Proposed Methodology Title :

Electricity generation by rehabilitation of run-of river hydro power generation system(s) in Indonesia

Methodology Proponent : Institute for Global Environmental Strategies
Proposed Methodology Document & Additional Information :

Proposed Methodology [PDF]

Proposed Methodology Sheet [Excel]

Additional Information [PDF]

All Stakeholders are invited to provide their comments on the proposed methodology to the following both two e-mail addresses : id-pm-pi@jcm.go.jp dan secretariat@jcmindonesia.com only in English, including the following information :

  • Name :
  • Affiliated Organization :
  • E-mail Address :
  • Country :
  • Part of the document (Cover sheet/A/B/C/etc):
  • Page the document:
  • Comment on the page (including justification of the change):
  • Proposed change (including proposed text):

*Notes : The Secretariat makes all received comments publicly available.  

**This call for public comment period is open from 20 September to 4 October 2019 (24:00 GMT)

 

 

Submission Date Submission
   

 

BACK