[CLOSED] - Public Comment on proposed project PDD ID023 "Installation of Solar Power System and Storage Battery to Commercial Facility"
The draft PDD was submitted to the JCM secretariat between Indonesia and Japan on 27 December 2019.
The JCM secretariat of Indonesian and Japanese side makes the draft PDD publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.
Information on the proposed project below is available for download.
All stakeholders are invited to provide their comments on the proposed project to the following both two email addresses id-pdd-pi@jcm.go.jp; secretariat@jcmindonesia.com only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:
NOTE: The secretariat makes all received comments publicly available unless the TPE determines that the comment is unauthentic in line with paragraph 42 of the Joint Crediting Mechanism Project Cycle Procedure.
This call for public comments is open from 15 January until 13 February 2020 (24:00 GMT).
Project title |
Installation of Solar Power System and Storage Battery to Commercial Facility |
---|---|
Name of project participants (Indonesia) | PT AEON Mall Indonesia |
Name of project participants (Japan) | ITOCHU Corporation |
Name of third party entity (TPE) | TPE-ID-013 PT TUV Rheinland Indonesia |
Location of project |
Country: Republic of Indonesia Latitude, Longitude: 6°10'19.6"S 106°57'06.9"E |
Duration | Starting date of project operation: 30 Sep 17 Expected operational lifetime of project: 4 years |
Methodology No. | |
Emission Reductions |
Estimated emission reductions in each year (tCO2) :
|
Status | PDD and MOC submitted |