ID022 Introduction of High Efficiency Once-through Boiler in Golf Ball Factory

Project Title Introduction of High Efficiency Once-through Boiler in Golf Ball Factory
Ref No. ID022
Document

PDD 

Monitoring Plan

MoC (PDF) MoC
Project Participants (Indonesia) PT Sumi Rubber Indonesia
Project Participants (Japan) Sumitomo Rubber Industries, Ltd.; Nippon Koei Co., Ltd.
Third Party Entities TPE-ID-002 Lloyd's Register Quality Assurance Limited
Location of Project

Country: Republic of Indonesia
Region/State/Province etc: West Java Province
City/Town/Community etc: Karawang Regency
Latitude, longitude:

S 6°24'54", E 107°24'51"

Duration Starting date of project operation: 01 July 16
Expected operational lifetime of project: 9 years
Methodology No.

ID_AM015 Ver1.0

Emission Reductions (tCO2e)

Estimated emission reductions in each year

  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • 59 (in 2016)
  • 148 (in 2017)
  • 148 (in 2018)
  • 148 (in 2019)
  • 148 (in 2020)
  • 148 (in 2021)
  • 148 (in 2022)
  • 148 (in 2023)
  • 148 (in 2024)
  • 74 (in 2025)
  • - (in 2026)
  • - (in 2027)
  • - (in 2028)
  • - (in 2029)
  • - (in 2030)
status Project Registered
Public comment

25 Mar 19  -  23 Apr 19

Registration Registration Form
Validation Report (PDF)
Completeness Check Complete on 27 Jun 19
Registration Date 03 Sep 19