ID019 Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia

Project Title Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia
Ref No. ID019
Document

PDD 

Monitoring Plan

MoC (PDF) MoC
Project Participants (Indonesia) PT. Toyota Motor Manufacturing Indonesia
Project Participants (Japan) Toyota Tsusho Corporation
Third Party Entities TPE-ID-003 Japan Quality Assurance Organization
Location of Project

Country: Republic of Indonesia
Region/State/Province etc: Jawa Barat 41361
City/Town/Community etc:  Jl. Permata Raya Lot DD-1, Kawasan Industri KIIC, Karawang
Latitude, longitude: Latitude: 6°21'22.8"S 107°17'39.7"E

Duration Starting date of project operation: 01 Dec 17
Expected operational lifetime of project: 9 years
Methodology No.

ID_AM0016 Ver1.0

Emission Reductions (tCO2e)

Estimated emission reductions in each year (tCO2) : 

  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • - (in 2016)
  • 1,816 (in 2017)
  • 21,793 (in 2018)
  • 21,793 (in 2019)
  • 21,793 (in 2020)
  • 21,793 (in 2021)
  • 21,793 (in 2022)
  • 21,793 (in 2023)
  • 21,793 (in 2024)
  • 21,793 (in 2025)
  • 19,977 (in 2026)
  • - (in 2027)
  • - (in 2028)
  • - (in 2029)
  • - (in 2030)
status Project Registered
Public comment

14 Dec 18  -  12 Jan 19

Registration Registration Form
Validation Report (PDF)
Completeness Check Complete on 28 Mar 19
Registration Date 09 May 2019