[CLOSED] - Public Comment on proposed methodology ID_PM028 "Electricity generation by installation of run-of-river hydro power generation system(s) in Indonesia"
Below is the proposed methodology which has been submitted to Joint Committee Indonesia and Japan on 11 March 2019. Secretariat has done the completeness check towards the proposed methodology and has been considered as complete. Secretariat has publicized the proposed methodology which is open for public comment in accordance with the provision on para 1.4.3 in The Joint Crediting Mechanism Project Cycle Procedure [pdf]
Proposed Methodology : ID_PM028
Proposed Methodology Title | : | Electricity generation by installation of run-of-river hydro power generation system(s) in Indonesia |
Methodology Proponent | : | Institute for Global Environmental Strategies |
Proposed Methodology Document & Additional Information | : |
All Stakeholders are invited to provide their comments on the proposed methodology to the following both two e-mail addresses : id-pm-pi@jcm.go.jp dan secretariat@jcmindonesia.com only in English, including the following information :
- Name :
- Affiliated Organization :
- E-mail Address :
- Country :
- Part of the document (Cover sheet/A/B/C/etc):
- Page the document:
- Comment on the page (including justification of the change):
- Proposed change (including proposed text):
*Notes : The Secretariat makes all received comments publicly available.
**This call for public comments is open from 25 March to 08 April 2019 (24:00 GMT)
Comment/Input have been received
Submission Date | Submission |
---|---|