ID017 Introduction of 0.5MW Solar Power System to Aroma and Food Ingredients Factory

Project Title Introduction of 0.5MW Solar Power System to Aroma and Food Ingredients Factory
Ref No. ID017
Document

PDD 

Monitoring Plan

MoC (PDF) MoC
Project Participants (Indonesia) PT. Indesso Aroma
Project Participants (Japan) Next Energy and Resources Co., Ltd.
Third Party Entities TPE-ID-002 Lloyd’s Register Quality Assurance Limited
Location of Project

Country: Republic of Indonesia
Region/State/Province etc: Bogor Regency, West Java Province
City/Town/Community etc:  Jl Alternatif Cibubur Cileungsi Km.9, Cileungsi 16820
Latitude, longitude: Latitude: S 6°23'31", Longitude: E 106°57'21" 

Duration Starting date of project operation: 02 Apr 18
Expected operational lifetime of project: 10 years
Methodology No.

ID_AM0013 Ver1.0

Emission Reductions (tCO2e)

Estimated emission reductions in each year (tCO2) : 

  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • - (in 2016)
  • - (in 2017)
  • 314 (in 2018)
  • 417 (in 2019)
  • 414 (in 2020)
  • 411 (in 2021)
  • 408 (in 2022)
  • 405 (in 2023)
  • 402 (in 2024)
  • 399 (in 2025)
  • 397 (in 2026)
  • 394 (in 2027)
  • 98 (in 2028)
  • - (in 2029)
  • - (in 2030)
status Project Registered
Public comment

01 Sep 18 - 30 Sep 18

Registration Registration Form
Validation Report (PDF)
Completeness Check Complete on 13 Dec 2018
Registration Date 07 Mar 2019