[CLOSED] Installation of Tribrid System to mobile communication’s Base Transceiver Stations in Republic of Indonesia
The draft PDD was submitted to the JCM secretariat between Indonesia and Japan on 27 February 2018.
The JCM secretariat of Indonesian and Japanese side makes the draft PDD publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.
Information on the proposed project below is available for download.
All stakeholders are invited to provide their comments on the proposed project to the following both two email addresses id-pdd-pi@jcm.go.jp; secretariat@jcmindonesia.com only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:
NOTE: The secretariat makes all received comments publicly available unless the TPE determines that the comment is unauthentic in line with paragraph 42 of the Joint Crediting Mechanism Project Cycle Procedure.
This call for public comments is open from: 28 February to 29 March 2018 (24:00 GMT).
Project title |
Installation of Tribrid System to mobile communication’s Base Transceiver Stations in Republic of Indonesia |
---|---|
Name of project participants (Indonesia) | PT XL Axiata Tbk. |
Name of project participants (Japan) | KDDI Corporation |
Name of third party entity (TPE) | TPE-ID-003 Japan Quality Assurance Organization |
Location of project |
Country: Republic of Indonesia The exact location (latitude, longitude) of the BTS cannot be disclosed in order to ensure the security of telecommunication. |
Duration | Starting date of project operation: 01 Jan 18 Expected operational lifetime of project: 10 years |
Methodology No. | ID_AM014ver0.1 |
Emission Reductions |
Estimated emission reductions in each year
|
Status | PDD and MOC submitted |