[CLOSED]- Public Comment on proposed project PDD ID015 "Reducing GHG emission at textile factories by upgrading to air-saving loom"

The draft PDD was submitted to the JCM secretariat between Indonesia and Japan on 1 February 2018.
The JCM secretariat of Indonesian and Japanese side makes the draft PDD publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.

Information on the proposed project below is available for download.

All stakeholders are invited to provide their comments on the proposed project to the following both two email addresses id-pdd-pi@jcm.go.jp; secretariat@jcmindonesia.com only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:

NOTE: The secretariat makes all received comments publicly available unless the TPE determines that the comment is unauthentic in line with paragraph 42 of the Joint Crediting Mechanism Project Cycle Procedure.

This call for public comments is open from: 6 February to 7 March 2018 (24:00 GMT).

Project title

Reducing GHG emission at textile factories by upgrading to air-saving loom
Ref No. ID015
PDD 
Monitoring Plan

Name of project participants (Indonesia) P.T. Indonesia Synthetic Textile Milles (ISTEM) P.T. Easterntex P.T. Century Textile Industry Tbk (CENTEX)
Name of project participants (Japan) Toray Industries, Inc
Name of third party entity (TPE) TPE-ID-011 PT MUTU AGUNG LESTARI
Location of project

Country: Republic of Indonesia
Region/State/Province etc: P.T. Indonesia Synthetic Textile Milles (ISTEM): West Java P.T. Easterntex: East Java P.T. Century Textile Industry Tbk (CENTEX): Jakarta
City/Town/Community etc: P.T. Indonesia Synthetic Textile Milles (ISTEM): Jl Mochamad Toha KM.1, Pasar Baru, Karawaci Tangerang, Banten P.T. Easterntex: KM. 50 Surabaya – Pandaan Kab. Pasuruan, JAWA TIMUR P.T. Century Textile Industry Tbk (CENTEX): Jl. Raya Bogor KM 27, Ciracas, Jakarta

Latitude, longitude: P.T. Indonesia Synthetic Textile Milles (ISTEM):6°10'01.9"S 106°37'20.5"E P.T. Easterntex: 7°40'31.5"S 112°42'11.9"E P.T. Century Textile Industry Tbk (CENTEX): 6°19'31.6"S 106°52'40.0"E 

Duration Starting date of project operation: 01 January 2017
Expected operational lifetime of project: 7 years
Methodology No. ID_AM011_ver0.1
Emission Reductions

Estimated emission reductions in each year (tCO2) : 

  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • - (in 2016)
  • 682 (in 2017)
  • 682 (in 2018)
  • 682 (in 2019)
  • 682 (in 2020)
Status PDD and MOC submitted

 

BACK