[CLOSED] Public Comment on proposed project PDD ID012 "GHG Emission reduction through utility facility operation optimization system for refineries in the Republic of Indonesia" (October 20th - November 18th, 2017)
The draft PDD was submitted to the JCM secretariat between Indonesia and Japan on 7 September 2017.
The JCM secretariat of Indonesian and Japanese side makes the draft PDD publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.
Information on the proposed project below is available for download.
All stakeholders are invited to provide their comments on the proposed project to the following both two email addresses id-pdd-pi@jcm.go.jp; secretariat@jcmindonesia.com only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:
NOTE: The secretariat makes all received comments publicly available unless the TPE determines that the comment is unauthentic in line with paragraph 42 of the Joint Crediting Mechanism Project Cycle Procedure.
This call for public comments is open from: October 20th, 2017 to November 18th, 2017 (24:00 GMT).
Project title |
GHG Emission reductions through utility facility operation optimization system for refineries in the Republic of Indonesia |
---|---|
Name of project participants (Indonesia) | PT. PERTAMINA (PERSERO) |
Name of project participants (Japan) | Azbil Corporation |
Name of third party entity (TPE) | TPE-ID-003 Japan Quality Assurance Organization |
Location of project |
Country: Republic of Indonesia Latitude, longitude: S 7.703388, E 109.005269 |
Duration | Starting date of project operation:01 / 12 /2017 Expected operational lifetime of project: 5 years |
Methodology No. | |
Emission Reductions |
Estimated emission reductions in each year (tCO2) :
|
Status | PDD and MOC submitted |