ID008 Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2

Project Title Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2
Ref No. ID008
Document PDD Form
Monitoring Plan
MoC (PDF) Download PDF
Project Participants (Indonesia) PT. TTL Residences
Project Participants (Japan) Toyota Tsusho Corporation
Location of Project

Country: Republic of Indonesia
Region/State/Province etc: West Java Province
City/Town/Community etc: JL. PAJAJARAN NO.7 DESA SUKARESMI, LIPPO CIKARANG BEKASI 17550
Latitude, longitude: S06°19'40.5660", E107°08'02.3028"

Third Party Entities TPE-ID-003 Japan Quality Assurance Organization
Duration Starting date of project operation: 01 April 16
Expected operational lifetime of project: 8 years
Methodology No. ID_AM010 ver1.0
Emission Reductions (tCO2e)

Estimated emission reductions in each year :

  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • 131 (in 2016)
  • 175 (in 2017)
  • 175 (in 2018)
  • 175 (in 2019)
  • 175 (in 2020)
Status Project Registered
Public comment 6 August 2016 - 4 September 2016
Registration Registration Form
Validation Report (PDF)
Completeness Check Complete on 27 January 2017
Registration Date 10 February 2017